Moatize, Tete, Moçambique
Diversion of National Road 103, for about 2km, including a bridge over the river and over the road of the mine, so it doesn’t interfere with the mining process.
• Master Plan – Layout and technical solutions conception;
• Preliminary Study – Detailing layout in plan and in frontage, and special structures;
• Final Design – Plan detail, transversal and longitudinal profiles and complementary special structures.