Mozambique, Nacala Corridor
Rehabilitation of Nacala Railway Corridor – Section 7 – Cuamba / Nacala (500Km) – Rehabilitation and strengthening of existing railway bridges.
• Structural inspection and testing of 18 railway bridges and respective reports;
• Technical opinion on the structural strengthening projects previously prepared for two other bridges;
• Technical opinion on the preliminary studies previously prepared for 14 bridges, which determined its abandonment;
• Feasibility Study of the strengthening solutions for all bridges;
• Detail design of rehabilitation and strengthening of 18 railway bridges.