Hydroelectric Harnessing of the Baixo Sabor River - Upstream Dam

Bragança, Portugal

ODEBRECHT ENGENHARIA / LENA CONSTRUÇÕES

 

Construction of a 123 m high concrete arch dam, with a volume of about 700,000 m3. A shaft type powerhouse will be equipped with two reversible units, located in independent wells, with a diameter of 11.5 m, a height of 79 m. The independent pressure tunnels have a 5.7 m diameter. The diversion works will consist of two cofferdams and a 400 m long tunnel, with a diameter of 7 m.

 

• Geological and geotechnical mapping of excavated fronts (open pit and underground); 

 

• Elaboration of instrumentation and monitoring design and analysis of obtained data; 

 

• Contribution for the outlining of construction methodologies and quarry exploitation; 

 

• Geotechnical design of open pit and underground excavations and its support systems.

< >