projects > HYDRAULIC INFRASTRUCTURES

Moatize River Realigment

Moatize, Tete, Moçambique

VALE

 

Diversion of the Moatize River, for 12km with a 1.000m3/s flow, removing it from the Coal Mine and placing it at the border of the urban perimeter of the Moatize village, so it doesn’t interfere with the mining process.

 

• Master Plan – Layout, pre-dimensioning and technical solutions conception;


• Preliminary Study – Hydraulic and hydrological studies, detailing layout in plan and in frontage, and special structures;


• Final Design – Plan detail, transversal and longitudinal profiles of the river, and detailing complementary special structures.

< >