projects > HYDRAULIC INFRASTRUCTURES

River Cambamba, Luanda. Regularization of the urban stretch.

Luanda, Angola

GGPDT Futungo de Belas e Mussulo

 

Regularization of the Cambanda River, with a 250 km2 catchment basin and a 700m3/s flow, for an extension 12 km that flows through the city of Luanda till the river mouth, including the study of retention of solid waste.

 

• Master Plan – Analysis of the existent situation and proposal of technical solutions for the regularization and cleaning of solid waste.

 

< >