Hydroelectric Harnessing of the Baixo Sabor River - Downstream Dam

Bragança, Portugal

ODEBRECHT ENGENHARIA / LENA CONSTRUÇÕES

 

Construction of a 45 m high concrete gravity dam. The independent 2 pressure tunnels have 150m length e 5.7 m diameter.

 

• Geological and geotechnical mapping of excavated fronts (open pit and underground); 

 

• Elaboration of instrumentation and monitoring design and analysis of obtained data; 

 

• Contribution for the outlining of construction methodologies and quarry exploitation;

 

• Geotechnical design of open pit and underground excavations and its support systems.

< >