Bragança, Portugal
Construction of a 45 m high concrete gravity dam. The independent 2 pressure tunnels have 150m length e 5.7 m diameter.
• Geological and geotechnical mapping of excavated fronts (open pit and underground);
• Elaboration of instrumentation and monitoring design and analysis of obtained data;
• Contribution for the outlining of construction methodologies and quarry exploitation;
• Geotechnical design of open pit and underground excavations and its support systems.